• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Gift Guides
    • Valentine’s Day
Indiana Chronicle Wordmark

Indiana Chronicle

Your Independent Indiana News Source Covering Indiana, U.S. & World News.

  • Indianapolis News
    • Indianapolis Crime
    • Indianapolis Politics
  • Indiana News
    • Indiana Crime
    • Indiana Politics
  • U.S. News
    • Product Recalls
    • U.S. Business
    • U.S. Crime
    • U.S. Government
    • U.S. Military
    • U.S. Politics
    • U.S. Weather
  • Sports
    • Autosport
      • INDYCAR
      • INDY NXT
      • NASCAR
  • Arts & Entertainment
    • Music
      • Live Music
  • Living
    • Books
  • Technology
    • Fun With AI
    • Photography
    • Web Development
Home » Revive I-70 Overhead Sign Work Planned this Week

Revive I-70 Overhead Sign Work Planned this Week

May 5, 2025 by Indiana Chronicle Leave a Comment

Revive I 70 2025 Logo

Wayne County, Ind. (May 5, 2025) – Work continues on the Revive I-70 corridor in Wayne County this week, including relocating an overhead sign on eastbound I-70 near U.S. 40.

Drivers can expect the following:

Monday, May 5

  • Short (20-minute) rolling slowdowns on eastbound I-70 from U.S. 27 to U.S. 40 (around midnight)
  • One lane of eastbound I-70 closed from mile marker 155 to westbound U.S. 40/Exit 156A (8 p.m. to 7 a.m.)
  • Ramp from eastbound I-70 to westbound U.S. 40/Exit 156A closed (8 p.m. to 7 a.m.)

Tuesday, May 6 through Friday, May 9

  • Eastbound I-70 shoulder closures near mile marker 155 (7 a.m. to 5 p.m.)

Wednesday, May 7

  • One lane of westbound I-70 closed from U.S. 27 to Clear Creek bridge (8 p.m. to 7 a.m.)
    • Rolling slowdown may be needed to move equipment (around 1 a.m.)

All closures and restrictions are weather dependent.

Delays Anticipated

Necessary traffic restrictions will cause delays on I-70. Drivers should plan ahead and use alternate routes, when possible.

Construction Speed Limit Now Active

The construction zone speed limit is now active on I-70. A reduced speed of 55 mph is in place for the duration of Revive I-70 work. It is important for drivers to slow down and avoid distractions in work zones.

SOURCE: Indiana Department of Transportation

Filed Under: Indiana News, Indiana Roadwork Tagged With: I-70, Indiana Department of Transportation, Indiana Road Construction, Indiana Road Work, INDOT, Interstate 70, Revive I-70, Road Construction, Road Work, U.S. 27, U.S. 40, Wayne County


Related Posts


June 2, 2025
S.R. 13 to close for construction on the Indiana Toll Road


June 2, 2025
Road closure to impact U.S. 150 in western Vigo County


May 5, 2025
Closure planned on State Road 356 in Jefferson County


May 2, 2025
Resurfacing work to begin on State Road 28 in Tipton


March 13, 2025
Allen County Quadrant Roadway Construction Begins


March 13, 2025
Bridge work planned on State Road 62 in Harrison County


Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

FOLLOW US

  • Facebook
  • Twitter

SUBSCRIBE

RSS Naptown Buzz

  • Exciting Events at Victory Field: Youth Clinic, Bark in the Park, Star Wars™ Night, and More May 27, 2025
  • 2025 Indianapolis 500 Prize Money: Full Driver Payout Breakdown May 27, 2025
  • Complete Schedule for the 109th Indianapolis 500 Race Day 2025 May 25, 2025
  • Ultimate Guide to Legends Day at the 109th Indianapolis 500 May 24, 2025
  • Everything You Need to Know About Miller Lite Carb Day 2025 at Indianapolis Motor Speedway May 23, 2025

Latest News

  • Closure planned on State Road 56 west of Salem June 17, 2025
  • Evansville: Opening of Redesigned Stockwell Road Intersection June 17, 2025
  • Two Arrested for Shoplifting by Off Duty Trooper June 11, 2025
  • S.R. 13 to close for construction on the Indiana Toll Road June 2, 2025
  • Road closure to impact U.S. 150 in western Vigo County June 2, 2025

As Featured on Stranger Things

Indiana Chronicle featured on Stranger Things

© Copyright 2005-2025 Naptown Buzz LLC